happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
2029_Rebuilding_the_Wall.JPG
9 viewsverticalift
2129_Rebuilding_the_Wall.JPG
9 viewsverticalift
2229_Re-design_of_Interior_Wall.JPG
9 viewsverticalift
2729_Thai_Technology___Not_going_all_that_well_.JPG
9 viewsverticalift
2229_Re-design_of_Interior_Wall~0.JPG
9 viewsverticalift
DSC03132.jpg
9 viewsWall tile is laid much the same way. This example shows bathroom wall tile being set in place. The wall is scored and pure cement is for maximum adhesion. (03-Jun-04)dozer
DSC03037.JPG
9 viewsThe entry road has been getting bad for quite some time now until it is like this! Passing is now impossible except with a 4 wheel drive. (22-May-04)dozer
DSC01155.jpg
9 viewsBuilding the wood framework. (24-Apr-04)dozer
DSC02054.jpg
9 viewsA partially enclosed section on the back part of the house.dozer
DSC02091.jpg
9 viewsThe wood framework above the parking area. (11-May-04)dozer
DSC02106.jpg
9 viewsDecorative wood trim is applied around the foundation posts. (12-May-04)dozer
DSC03023.jpg
9 viewsThe partially completed section over the parking spot. (21-May-04)dozer
7141 files on 596 page(s) 567

Debug Info 
Debug Output: show / hide