happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
1329_Delivery_Day.jpg
10 viewsverticalift
1929_Plumbing.jpg
10 viewsverticalift
2429_Tub_on_Palet_Before_Final_Postioning~0.JPG
10 viewsverticalift
2529_Getting_Ready_for_Final_Move.JPG
10 viewsverticalift
DSC02149~0.jpg
10 viewsHere the next tile is set in place. dozer
DSC04020.jpg
10 viewsHere a border or 'skirt' is being laid out. The wall is scored to allow for maximum adhesion. The skirt should ideally be done before the wall has been painted. (14-Jun-04)dozer
DSC04021.jpg
10 viewsFinishing off a detail section is a doorway.dozer
DSC02017.jpg
10 viewsThis shot shows a sample of the support metal which is used to support the ceiling sheetrock. It is the 'U' shaped metal piece in the upper portion of the photo. (27-Apr-04)dozer
DSC02058.jpg
10 viewsThe metal frame is supported by attaching wire to the truss metal. (05-May-04)dozer
DSC02063.jpg
10 viewsMetal supports are spaced at about 2/3 meter square.dozer
DSC02109~0.jpg
10 viewsSheetrock laid in place with cut outs for lighting and fans. (12-May-04)dozer
DSC04032.jpg
10 viewsThis type of down lighting snaps in place and is easier to install than less expensive types. (17-Jun-04)dozer
7141 files on 596 page(s) 562

Debug Info 
Debug Output: show / hide