|
Most viewed |
10 viewsHere a border or 'skirt' is being laid out. The wall is scored to allow for maximum adhesion. The skirt should ideally be done before the wall has been painted. (14-Jun-04)dozer
|
|
10 viewsFinishing off a detail section is a doorway.dozer
|
|
10 viewsThis shot shows a sample of the support metal which is used to support the ceiling sheetrock. It is the 'U' shaped metal piece in the upper portion of the photo. (27-Apr-04)dozer
|
|
10 viewsThe metal frame is supported by attaching wire to the truss metal. (05-May-04)dozer
|
|
10 viewsMetal supports are spaced at about 2/3 meter square.dozer
|
|
10 viewsSheetrock laid in place with cut outs for lighting and fans. (12-May-04)dozer
|
|
10 viewsThis type of down lighting snaps in place and is easier to install than less expensive types. (17-Jun-04)dozer
|
|
10 viewsFinished ceiling section. (18-Jun-04)dozer
|
|
10 viewsThe wide area show here will be for the entry gate. dozer
|
|
10 viewsCement is poured using a large metal can as a form, about 30 cm square. (13-Jan-04) dozer
|
|
10 viewsStone as used to make concrete. (20-Apr-04)dozer
|
|
10 viewsCement mix is prepared depending on what is being done, but a normal mix would be 2 parts cement to 3 parts sand. Add in 4 parts stone to yield concrete. (20-Apr-04)dozer
|
|
7141 files on 596 page(s) |
|
|
|
|
|
562 | |
|
|
|
|
|
|
|