happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
DSC00020.jpg
13 viewsPost holes like this are dug each 2.5 meters. The stick at the bottom signifies the center of the fence post to be poured. The hole is 60 cm square, 60 cm deep. (11-Jan-04) dozer
DSC00037.jpg
13 viewsAnother view of the back wall. dozer
DSC05069.jpg
13 viewsThe gate track is laid in position. (15-Jul-04)dozer
DSC04135~0.jpg
13 viewsShaping the driveway. (27-Jun-04)dozer
DSC05119~3.jpg
13 viewsTile roof example. (13-Aug-04)dozer
DSC00110~0.jpg
13 viewsThe roof tile is wired on to hold it in place. Notice the tile sits in place on the 1 * 1 metal cross beam. (22-Mar-04) dozer
DSC02004~0.jpg
13 viewsCement work on the roof tiles. (26-Apr-04)dozer
DSC02083~0.jpg
13 viewsPlastic inserts like these come in easy to install strips, each piece covering 3 sections (like the one shown). The are used to prevent birds and rodents from entering the attic area. (09-May-04)dozer
DSC04134~0.jpg
13 viewsClose up of wood windows which have been varnished. There are various treatments available for wood, the most common being varnish or urethane, for outside surfaces a good quality varnish will tend to hold up better. (27-Jun-04)dozer
DSC05021.jpg
13 viewsAnother house with wood windows. (06-Jul-04)dozer
DSC02058~0.jpg
13 viewsThe metal frame is supported by attachment to the truss metal. (05-May-04)dozer
DSC02113~0.jpg
13 viewsThe counter will be supported by red brick columns. (13-May-04)dozer
7141 files on 596 page(s) 550

Debug Info 
Debug Output: show / hide