happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
2329_Faucet_Placement.JPG
13 viewsverticalift
2829_My_Technology2C_Using_bits_from_my_boat_.JPG
13 viewsverticalift
2129_Rebuilding_the_Wall~0.JPG
13 viewsverticalift
Courtyard_Bathroom_Renovation_003.JPG
13 viewsverticalift
Courtyard_Bathroom_Renovation_004.JPG
13 viewsverticalift
Courtyard_Bathroom_Renovation_008.JPG
13 viewsverticalift
DSC02148.jpg
13 viewsEach tile is carefully tapped into place. (14-May-04)dozer
DSC05093.JPG
13 viewsI wanted to contrast the previous road to what everyone would really like to see. This land is subdivided and a concrete entry road has been poured to a 20 centimeter depth. There is also associated drainage and the electric is already setup, all prior to any building started. Now, the downside. This land, which is in the same area as the cool thai house plot, is 2 1/2 times more expensive, and the minimum lot size is 1 rai (at 2.5 million Baht)! So, you can find perfection but you must pay the price! (29-Jul-04)dozer
DSC02066.jpg
13 viewsAnd it attaches to the support metal framework like this. (06-May-04)dozer
DSC02073.jpg
13 viewsChecking the frame. (07-May-04)dozer
DSC02113.jpg
13 viewsThe counter will be supported by red brick columns. (13-May-04)dozer
DSC02133.jpg
13 viewsMetal rebar (2 hun) is used in forming the brick column supports to add strength. A hole is drilled in the wall and the metal inserted.dozer
7141 files on 596 page(s) 549

Debug Info 
Debug Output: show / hide