|
Most viewed |
15 viewsTaping the sheetrock seams. (07-Jun-04)dozer
|
|
15 viewsThe counter after the cement pour. (27-Apr-04)dozer
|
|
15 viewsThis is the entry way for the walk in gate. dozer
|
|
15 viewsIn the gate is composed of 1 1/2 " square metal frame and vertical 1" square metal bars. The inside circular decorations were bought pre-finished, we use a butterfly and flower design. dozer
|
|
15 viewsFitting the gate in place. The metals are painted with a primer first and then painted with a quality oak shade of paint. (23-Jul-04)dozer
|
|
15 viewsFitting a wall piece in place. (26-Jul-04)dozer
|
|
15 viewsMetal fencing section. (15-Aug-04)dozer
|
|
15 viewsMetal entry door. (22-Aug-04)dozer
|
|
15 viewsThe row of bricks is attached to the wall with strips of rebar for strength. (24-Jun-04)dozer
|
|
15 viewsNearly completed planter box on the front right of the patio.dozer
|
|
15 viewsThe metal support structures for the house use metal of guage 4 hun full with the cross supports 3 hun full. They are temporarily held upright by a wood support. (29-Feb-04)dozer
|
|
15 viewsThe wire being snipped in place. dozer
|
|
7141 files on 596 page(s) |
|
|
|
|
|
540 | |
|
|
|
|
|
|
|