Missing Foundation Columns281 viewsThis structure only has two traditional foundation columns, located at the front side of the front patio. The other columns have been replaced by the load bearing walls used as an integral part of the design.dozer
|
|
|
|
|
Superstructure280 viewsView of the entire house, from the front. At the front is the covered porch - 2 meters deep by 8 meters wide. You can't see it in this picture, but there's a separate roof over this area, dropped down and recessed into the main roof by about 50cm.DrDave
|
|
|
|
Roof Structure279 viewsThe roof is nearly finished and almost ready for roof tiles. It has taken about 2 weeks for the roofers to make this. The walls have been built in the last week of this time.kknaj
|
|
Use of Metal Scaffolding helps with Plumb Lines279 viewsReally tall metal scaffolding to be used in conjunction with laying the load bearing walls. Since there are no columns being used, extra attention to detail needs to be paid to laying the block work true. The scaffolding helps in this regard as a plumb line is set up and affixed to the metal scaffolding, which isn't subjected to movement as wood scaffolding would be
dozer
|
|
Glass Blocks279 viewsThis shot shows glass blocks being installed and the use of plastic spacers at the intersections to keep the blocks equidistant (spacing of 1 cm). dozer
|
|