happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
DSC04111~0.jpg
16 viewsBathtub in the process of being framed. The bathtub is being sized here. After this two more rows of supporting bricks were added, for a total of 4 supporting rows. (25-Jun-04)dozer
DSC00160.jpg
16 viewsThe PVC is then cemented in place.dozer
DSC02104.jpg
16 viewsOpening being made for the circuit breaker. (12-May-04)dozer
DSC00034.jpg
16 viewsTo add strength the blocks are cemented in place prior to pouring the supporting posts. The posts will be poured 'around' the blocks. Standard sizes for facing walls is 4 blocks high, the back sides are 7 blocks high. (24-Jan-04) dozer
DSC00040~0.jpg
16 viewsA wall section (front and side) with completed support post structures. dozer
DSC05072.jpg
16 viewsMetal being cut at the same time it is welded by another worker.dozer
DSC05030.jpg
16 viewsLaying a row of bricks. (08-Jul-04)dozer
DSC05040.jpg
16 viewsThe planter box which runs adjacent to the driveway. Notice the decorative cement finishing trim added on top. (09-Jul-04)dozer
DSC05151~0.jpg
16 viewsView of planter boxes from patio. (22-Aug-04)dozer
DSC05104.jpg
16 viewsThe paving stones are set in place.dozer
DSC00093~0.jpg
16 viewsThe cross supports are held in place by wire strands.dozer
DSC01140~0.jpg
16 viewsForm wood is wedged in place over the square upright rebar frames and then the concrete is poured in. The foundation columns should have a width of about 20 centimeters square. (24-Apr-04)dozer
7141 files on 596 page(s) 535

Debug Info 
Debug Output: show / hide