|
Most viewed |
|
|
|
|
|
|
|
Lower Section Tiled16 viewsPreparing for placing the mural, the lower section has been tiled and next the sandstone engraving will be lifted into place.dozer
|
|
16 viewsRoughed surface.dozer
|
|
16 viewsThe carport pour is 20 centimeters thick.dozer
|
|
16 viewsHand mixing concrete for the carport pour. (18-May-04)dozer
|
|
16 viewsShaping the driveway. (27-Jun-04)dozer
|
|
7141 files on 596 page(s) |
|
|
|
|
|
533 | |
|
|
|
|
|
|
|