happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
IMG_3103.JPG
6mm Tie-in Rebar285 viewsThis shows a piece of 6mm rebar which sits in between blocks as they are laid and goes through the column framework. This is used to secure the blocks on either side of the column together.dozer
IMG_4001.JPG
Heavy Metal Box Construction285 viewsThe metal used in the critical elements of the roof structure is 4" x 2" box section which is 3.2 mm thick of the heaviest grade of metal (heavy duty).
dozer
new_IMG_0803.jpg
284 viewstrehanse
3D_House07.jpg
Rear Elevation284 viewspklongball
new_IMG_0748.jpg
283 viewstrehanse
new_IMG_0802.jpg
283 viewstrehanse
100_0206.JPG
282 viewsPreparing the first floor. Precast re-inforced concrete slabs are laid across the beams.Thaifu T
new_DSC_0353.jpg
282 viewstrehanse
32607house_014.jpg
281 viewsGlenn
IMG_0678.JPG
281 viewstrehanse
new_IMG_0714.jpg
281 viewstrehanse
Floorplan.jpg
House floorplan281 viewsThis was the last drawing of the floor plan from the architect. We already have made a couple of changes to the master bath(pushed the wall out about 50cm) and the kitchen/office wall will push out about 100 cm to enlarge the kitchen mainlypklongball
7141 files on 596 page(s) 53

Debug Info 
Debug Output: show / hide