|
Most viewed |

18 viewsThe strip footing will have the rebar supports at 2.5 meter intervals. dozer
|
|

18 viewsAnother shot of the blocks. Note, there is a piece of rebar placed horizontally in the post then laid on top of the adjacent row of blocks. This metal piece is used to add strength. It is guage 2 hun full and is about 40 cm long. dozer
|
|

18 viewsThis is another material which can be used in combination with the entry posts. Here the posts are surrounded with a large decorative brick. (06-26-04)dozer
|
|

18 viewsHere is a heavy duty but simple design on a regular metal walk in entry with the gate to the left. (26-Jun-04)dozer
|
|

18 viewsA completed gutter section. (18-Jun-04)dozer
|
|

Metal Bent18 viewsHere the metal is bent to the specified angle. This angle forms the apex of the roof. dozer
|
|

Sheeting Riveted into Place18 viewsThe sheeting is riveted into place. dozer
|
|

Wierd Looking Bug18 viewsdozer
|
|
|

Lot Layout N-up18 viewsOur 1/2 rai. Right-side-up (until I figure out how to delete the upside-down one). 17-18m by 40-47m. An early plan. The house was roughly centered N-S later, making front, side and back garden areas. Colorado
|
|

December 9 2010 218 viewsBuild area 2 pic.fgrossiii
|
|

December 9 2010 418 viewsBuild area 4 pic.fgrossiii
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
525 |  |
 |
 |
 |
|

|
|
|