18 viewsSetting up a switch box for the two water pumps on the outside wall. (29-Jun-04)dozer
18 viewsStucco being applied to the perimeter wall.dozer
18 viewsFinished wall section with some decorative brickwork on the entry posts. (06-Jul-04)dozer
18 viewsThe rear gutter and down spout.(13-Aug-04)dozer
18 viewsThe resulting paving stone walkway. (12-Aug-04)dozer
18 viewsClose up of small red brick construction.dozer
18 viewsThe base rebar (4 hun full) is placed on top of a gravel sub footing. The stick represents the middle of the foundation post which is to be poured.dozer
18 viewsThe foundation post holes should be around 1 meter square and 1 meter deep. dozer