happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
DSC04063.jpg
18 viewsThe bathtub will be supported by this brick enclosure.dozer
DSC04073.jpg
18 viewsPartially tiled sink enclosure in the small bathroom. (22-Jun-04)dozer
DSC02161.jpg
18 viewsThe electrician expounding on all things electrical. (18-May-04)dozer
DSC03068.jpg
18 viewsSo they need to get chipped out.dozer
DSC04151.jpg
18 viewsSetting up a switch box for the two water pumps on the outside wall. (29-Jun-04)dozer
DSC04142.jpg
18 viewsStucco being applied to the perimeter wall.dozer
DSC05018.jpg
18 viewsFinished wall section with some decorative brickwork on the entry posts. (06-Jul-04)dozer
DSC05121~0.jpg
18 viewsThe rear gutter and down spout.(13-Aug-04)dozer
DSC05115.jpg
18 viewsThe resulting paving stone walkway. (12-Aug-04)dozer
DSC01014.jpg
18 viewsClose up of small red brick construction.dozer
DSC00072~0.jpg
18 viewsThe base rebar (4 hun full) is placed on top of a gravel sub footing. The stick represents the middle of the foundation post which is to be poured.dozer
DSC00074~0.jpg
18 viewsThe foundation post holes should be around 1 meter square and 1 meter deep. dozer
7141 files on 596 page(s) 523

Debug Info 
Debug Output: show / hide