|
Most viewed |
19 viewsCompleted and tiled shower enclosure base. (20-Jun-04)dozer
|
|
19 viewsCabinet in progress in the large bathroom. (21-Jun-04)dozer
|
|
19 viewsThe plumber finishing off the shower enclosure.dozer
|
|
19 viewsThis is a critical piece of plumbing which is used under the bathtub. Without it, for one thing, foul smells can flow in through the bathtub from the water septic. (24-Jun-04)dozer
|
|
19 viewsLarge bathroom bathtub and toilet.dozer
|
|
19 viewsLarge bathroom sink. This is one of those minor annoyances. This sink was placed a little too near the wall which means one needs to bend forward to use it.dozer
|
|
19 viewsThe entry switch box with 6 groups of wires. On the left is the electrical for a fan. (23-May-04)dozer
|
|
19 viewsThe electrical systems feeds the 35 down lights and 5 fans hooked on the ceiling. (18-Jun-04)dozer
|
|
19 viewsPreparing the circuit breaker. (19-Jun-04)dozer
|
|
19 viewsThe gate and metal fencing in place. (13-Aug-04)dozer
|
|
19 viewsThe gate wheels are very important. There are two sets of heavy duty 3" stainless steel wheels. (27-Aug-04)dozer
|
|
19 viewsThe gate anchor.dozer
|
|
7141 files on 596 page(s) |
|
|
|
|
|
518 | |
|
|
|
|
|
|
|