happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
IMG_5963.JPG
19 viewsnanbuilder
IMG_5969.JPG
View looking up from the bottom of the land19 viewsLooking up from the boundary. Here will be the large fishing pond and gardens. The small half dead tree centre will be our 'deck' at the rear of the house for the good stuff like beer, BBQ and Pizza.nanbuilder
IMG_5977.JPG
19 viewsnanbuilder
IMG_2752.jpg
Weber Tile Adhesive19 viewsThe weber tile adhesive is applied to prep the surface for the engraving.dozer
IMG_2755.jpg
Prep Back of Mural19 viewsThe adhesive is applied to the back of the engraving. dozer
DSCN0348.jpg
Large Sandstone Engraving19 viewsThese engravings come in various shapes and sizes, this one weighing 75kg brand name Melann (at the time 3 pc cost was 7500, one piece was 9500b). dozer
DSC01089.jpg
19 viewsA stick is used to designate the height of the pour. Here we used a height of 7 centimeters for the pour (allowing 3 centimeter for the tile).dozer
DSC01103.jpg
19 viewsThe still wet surface is 'roughed' in preparation for tiling. (20-Apr-04)dozer
DSC00150.jpg
19 viewsThe stucco is applied in coats. This is a rough coat. (02-Apr-04)dozer
DSC00100~0.jpg
19 viewsThe roof tile will lie on the 1 by 1, so they must be placed at proper intervals. Notice the cross beam supports which sits on top of the foundation posts. dozer
DSC02019.jpg
19 viewsThe tile is laid over aluminium drainage sheets in the valley section. dozer
DSC02033.jpg
19 viewsRepair work on valley in progress.dozer
7141 files on 596 page(s) 516

Debug Info 
Debug Output: show / hide