Decorative Standstone Carvings20 viewsThe small decorative sandstone 30 cm tiles (each under 200 baht) were placed in various locations on the wall. dozer
Partially Finished Wall20 viewsThe wall with the engraving in place and the lower portion of the sandstone tiling complete.dozer
Finish at adjacent Wall20 viewsThe corner was just painted to blend from the untiled wall to the tiled wall.dozer
Concrete Slurry20 viewsThe mix used to concrete the granite counter top to the base.dozer
20 viewsA tile mesh pattern is created above the sand flooring.dozer
20 viewsWorking on the front roof valley of the house. (28-Apr-04)dozer
20 viewsFront valley being completed. (30-Apr-04) dozer
20 viewsStarting to frame a bedroom door. A piece of 2 * 4 is used to keep the door in place.dozer