DSC00100.jpg
21 viewsThe roof structure is built using heavy guage steel. The bigger pieces are 4 *2 inches and 1.6 mm thick. The smaller pieces are 1 by 1 inch and 1.6 mm thick. The roof tile will lie on the 1 by 1's, so they must be placed at the proper interval. Notice the cross beam supports which sit on top of the foundation posts. (13-Mar-04)dozer
DSC04011.jpg
21 viewsLarge bathroom after tiling is almost complete. The water runoff drain is on the far left (near the bathtub area). The bathtub still needs to be plumbed in. (12-Jun-04)dozer
DSC04054.jpg
21 viewsThe sink cabinet being formed in the small bathroom. The cabinet is made from bricks. Note the metal on the right which is used to add strength. Holes are drilled in the wall and the metal is inserted prior to the final cement being laid on top.dozer
DSC04062.jpg
21 viewsThe large bathroom cabinet. dozer
DSC04129.jpg
21 viewsBathtub tiled in. (27-Jun-04)dozer
DSC05015.jpg
21 viewsSmall bathroom sink.dozer
DSC05038.jpg
21 viewsStainless septic exhaust cover installed. (09-Jul-04)dozer
DSC00114.jpg
21 viewsPVC conduit is run up the wall to house the electrical. (22-Mar-04)dozer
DSC05122.jpg
21 viewsPainted and finished wall section with decorative metal. (15-Aug-04)dozer
DSC01043.jpg
21 viewsThe well rings which are inserted in the finished well come in various diameters, the ones used here are 1.2 meters. dozer
DSC05125~1.jpg
21 viewsThe front gutter system. (15-Aug-04)dozer
DSC01020.jpg
21 viewsMid range house built for a foreign owner. (03-Apr-04)dozer