21 viewsA piece of wood is extended from the roof metal to allow the facia board to be attached. dozer
21 viewsRoof truss with attached facia board and drainage aluminum at the valley.dozer
21 viewsA wall section of the rear bedroom along. There has been additional metal placed in the roof truss which is now complete. Notice the two heavy gauge 4 * 2 metal beams shown in this shot. (28-Mar-04)dozer
21 viewsIn the process of placing roof tiles on the house. dozer
21 viewsThis cabinet door shows the use of anchor nails. Anchor nails are inserted at about 10 centimeter intervals and will be used as a strengthening anchor to the frame of the surrounding wall surface. (13-May-04)dozer
21 viewsA close up of the top and bottom sliding hinge used throughout. I think these look better than the side mounted hinges. (19-Jun-04)dozer
21 viewsA mounted inside solid wood door prior to being varnished.dozer
21 viewsThe glass needed to be cut for the grate windows with a glass cutter. (27-Jun-04)dozer
21 viewsFrom the back of the house. (13-May-04)dozer
21 viewsAnother shot from the back of the house.dozer
21 viewsThe footing of a foundation column. (29-Feb-04)dozer