|
Most viewed |
|
Building Area View 821 viewsLand to be filledSuper8man
|
|
|
Completed Wall21 viewsThe completed wall with large sandstone engraving and small sandstone feature tiles.dozer
|
|
Final Cracks21 viewsAny slight openings are grouted by the installers.dozer
|
|
Desks Ready for Granite Top21 viewsThe desks as built by the wood man (same one that did the wood trim painting and installation) as they sit ready for installation of the granite tops. dozer
|
|
21 viewsWall section in progress. (13-Mar-04)dozer
|
|
21 viewsStucco being applied to the rear of the house. (09-Apr-04)dozer
|
|
21 viewsThe stucco coat is thick as seen here, at least 1 centimeter thick. (17-Apr-04)dozer
|
|
21 viewsThe foundation posts are finished off by having decorative corners added. (19-Apr-04)dozer
|
|
21 viewsThe traces of underlying blocks will show until the cement dries. Before painting is a good time to examine the surface for cracks. (25-Apr-04)dozer
|
|
21 viewsThis area shows the entryway (on the left) as well as the front bedroom. (22-Mar-04)dozer
|
|
7141 files on 596 page(s) |
|
|
|
|
|
506 | |
|
|
|
|
|
|
|