DSC05012.jpg
23 viewsFinished cabinet section with stainless sink installed. (06-Jul-04)dozer
DSC03098.jpg
23 viewsThe 4" PVC is run into the toilet septic. The mallet is used to create the opening in the cement ring. (31-May-04)dozer
DSC04061.jpg
23 viewsThe 75 liter hot water heater which is mounted on the kitchen wall. This feeds hot water throughout the house.dozer
DSC05014.jpg
23 viewsCompleted small bathroom, toilet and shower enclosure. (06-Jul-04)dozer
DSC03041.jpg
23 viewsAnother shot of electrical PVC conduit. The switchbox mounted above the wall on the left really isn't necessary. It was installed by the first electrician.dozer
DSC03094.jpg
23 viewsThe back of the back outside switch box. (31-May-04)dozer
DSC03106.jpg
23 viewsThis is an after the fact picture - but shows where the ground is run to earth, just to the left of the PVC. This is the front of the driveway adjacent to the patio. The ground wire (grounding electrode conductor) is size 16, which runs to a piece of metal rod with is run into the ground 1.8 meters. The metal is 4 hun. Of significance, since surprisingly the electric department inspector wanted to know the specifics, as now apparently grounded electrical is required by the electric department. (02-Jun-04)dozer
DSC04050.jpg
23 viewsThe inside of the mounted circuit breaker. This is still in progress, the ground wires (grounding electrode conductors) are still to be added.dozer
DSC05146.jpg
23 viewsLarger socket receptacles used in the kitchen.dozer
DSC05042.jpg
23 viewsInterconnected gutters. (09-Jul-04)dozer
DSC01002.jpg
23 viewsAn upper end large house of an interesting and unique design. (03-Apr-04)dozer
DSC00131~1.jpg
23 viewsThe cement block is the most common material used in house construction. The blocks are laid in rows, with cement used to fit each block in place. (28-Mar-04)dozer