DSC00112.jpg
23 viewsFront door of house framed. There is a cement base above the door frame. (22-Mar-04)dozer
DSC04082.jpg
23 viewsHeavy duty hinge on an indoor door. (23-Jun-04)dozer
DSC04114.jpg
23 viewsThe front door lockset was installed upside down. It is amazing how many different things which go into a house can actually be installed backwards or upside down. (25-Jun-04)dozer
DSC04122.jpg
23 viewsThis was tough to get installed because it is not the typical 'low quality' lockset and the door installer hadn't done one like this before. Notice the plug used to fix the holes caused during the previous 'wrong way' installation. (26-Jun-04)dozer
DSC04159.jpg
23 viewsThis window is being prepped to have glass installed. The front wood needs to be removed and then reaffixed after the glass is inserted. (02-Jul-04)dozer
DSC04168.jpg
23 viewsThe final step is to caulk around each window piece installed. dozer
DSC06009.jpg
23 viewsA view of the area from the end of the road, with the cool thai house on the right. (02-Sep-04)dozer
DSC05139.JPG
23 viewsUpdate 16-Aug-04: Here is the tractor laying out the stone. This is great material, even when wet it maintains its shape.dozer
DSC00040.jpg
23 viewsThe perimeter wall is mostly completed. Still needs to be stuccoed. (27-Jan-04)dozer
DSC00152.jpg
23 viewsThis shows the rear door being framed. This is a repair job, since on the first attempt anchor nails were not used. This time nails will be placed at 4" intervals to anchor the door in place. (02-Apr-04)dozer
DSC03083.jpg
23 viewsThe floor tiling is complete. Now the only thing left to do is do a 10 centimeter tile border around the entire floor. (30-May-04)dozer
DSC05016.jpg
23 viewsThe finished large bathroom attached to the master bedroom. (06-Jul-04)dozer