23 viewsFront door of house framed. There is a cement base above the door frame. (22-Mar-04)dozer
|
|
23 viewsHeavy duty hinge on an indoor door. (23-Jun-04)dozer
|
|
23 viewsThe front door lockset was installed upside down. It is amazing how many different things which go into a house can actually be installed backwards or upside down. (25-Jun-04)dozer
|
|
23 viewsThis was tough to get installed because it is not the typical 'low quality' lockset and the door installer hadn't done one like this before. Notice the plug used to fix the holes caused during the previous 'wrong way' installation. (26-Jun-04)dozer
|
|
23 viewsThis window is being prepped to have glass installed. The front wood needs to be removed and then reaffixed after the glass is inserted. (02-Jul-04)dozer
|
|
23 viewsThe final step is to caulk around each window piece installed. dozer
|
|
23 viewsA view of the area from the end of the road, with the cool thai house on the right. (02-Sep-04)dozer
|
|
23 viewsUpdate 16-Aug-04: Here is the tractor laying out the stone. This is great material, even when wet it maintains its shape.dozer
|
|
23 viewsThe perimeter wall is mostly completed. Still needs to be stuccoed. (27-Jan-04)dozer
|
|
23 viewsThis shows the rear door being framed. This is a repair job, since on the first attempt anchor nails were not used. This time nails will be placed at 4" intervals to anchor the door in place. (02-Apr-04)dozer
|
|
23 viewsThe floor tiling is complete. Now the only thing left to do is do a 10 centimeter tile border around the entire floor. (30-May-04)dozer
|
|
23 viewsThe finished large bathroom attached to the master bedroom. (06-Jul-04)dozer
|
|