25 viewsThe improper final set caused water pockets around the side of the well, which eventually burst the side causing water to rapidly flow in, bring in dirt. To correct this we pumped out the water and patched the large gaping hole.dozer
|
|

Rerouted Electrical25 viewsSome electrical that ran encased in concrete prior needed to be re-routed. Add one to the reasons over time I don't like encasing anything in concrete. dozer
|
|

Column Lighting25 viewsElectrician preparing to install the lighting on the top of each column. dozer
|
|

Toads25 viewsThese guys were hiding from the rain maybe. At least this time they weren't in my shoe. dozer
|
|
|
|
|
|
|
|

Temporary Toilet for Workers25 viewsTemporary Toilet for Workers
Photographed on 2012-03-25newhomepages
|
|

Dec 15 2010 225 viewsPreparing to raise the first pole.fgrossiii
|
|