|
Most viewed |

First Floor Beams completed - formwork will be removed once the concrete has properly cured.25 viewschiyman
|
|

A view from the farm land25 viewschiyman
|
|

Roof Construction in progress25 viewschiyman
|
|

Building Area View 525 viewsLand to be filledSuper8man
|
|

an alternative to perimeter wall25 viewsA vinyl fence will last lifetime, enhance the beauty of your property.kelvinwoot
|
|

pool pond fence25 viewsA vinyl fence will last lifetime, enhance the beauty of your property.kelvinwoot
|
|

picket vinyl fence25 viewsA vinyl fence will last lifetime, enhance the beauty of your property.kelvinwoot
|
|
|

Sink Opening25 viewsThe sink opening for an undermount sink is always cut at the factory, the stove opening will be cut on-site.dozer
|
|

Shelving for Storage25 viewsOK, not actually anything welded, but they did cut, assemble and put together several sets of shelving. dozer
|
|

Camera UPS System25 viewsThis UPS accepts 220 V and outputs 12V DC. Since the output is 12V DC it can run longer on backup power.dozer
|
|

Two Wires25 viewsThe setup for an exterior camera includes VFF electrical wire and CCTV Cable which can be specialty cable or Coaxial RG6 (the same as used for TV connections).dozer
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
484 |  |
 |
 |
 |
|

|
|
|