happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
DSCF5070.JPG
27 viewschiyman
DSCF5073.JPG
Steel waiting to be lifted into place for inclusion in the roof27 viewschiyman
DSCF5068.JPG
roof construction with yuca pole support and scaffolding - These Thai construction guys were making it up as they went along!!! thank God no accidents.27 viewschiyman
DSCF5102.JPG
27 viewschiyman
P1090728.jpg
27 viewsThe site-office finished. Equipped with aircon, fridge, radio, desk, whiteboard - all modern conveniences. Ians
IMG_2124.jpg
Welding Lower Beam27 viewsWelding the lower beam in place. dozer
IMG_2177.jpg
Partial Door27 viewsThe beginning of the door and lower panel. dozer
IMG_2943.jpg
Adjusting the Counter Top27 viewsThe countertop being adjusted. dozer
DSCN0369.jpg
Security Metal27 viewsThe hand fabricated security metal. This was made from prefab pieces of metal. He welded them in sections and then installed them on top of the wall. dozer
DSCN0377.jpg
Bunk Bed27 viewsThis bunk bed was created from a small picture given to the welder by Ms Dozer. The pieces bolt together and it was a great use of some excess steel we had lying around. dozer
IMG_2317.jpg
Barbed Wire Support27 viewsThis shows a support for barbed wire which utilizes tensioners that fit into the support. dozer
DSCN0383.jpg
Switching Station27 viewsHere is a switching station which accepts power from the 1500 KVA UPS (220 V) and outputs power at 12 DC across nine channels. dozer
7141 files on 596 page(s) 473

Debug Info 
Debug Output: show / hide