|
Most viewed |

29 viewsHere is a shot in the tank after the problem was fixed. Notice how clear the water is now. (19-Aug-04) dozer
|
|

29 viewsPlacing of 3 inch PVC pipe used to aid drainage, placed at the lower level of the wall. dozer
|
|

Welding Stainless29 viewsWelding in a cross support on-site. dozer
|
|

Stainless Guys29 viewsStainless guys inspect their work.dozer
|
|

Finished Wall29 viewsThe finished wall a while later, crack has not re-appeared. dozer
|
|

Electric to Extrude through Columns29 viewsThe level of the original electric will be raised since the columns is being extended upwards.dozer
|
|

Wall Paper29 viewsThe wall paper starting to peel in an area where there was some water damage.dozer
|
|

Grouted Tile Section29 viewsA completed and grouted section of tiles.dozer
|
|

The Half-Rai organic farm29 viewsJust the bit of farmed ground up to, but not including the big tamarind tree. A bit of a shed there, which fronts the road on the NE corner of the property.Colorado
|
|
|
|

Concrete Footing29 viewsPhotographed on 2012-04-10newhomepages
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
464 |  |
 |
 |
 |
|

|
|
|