happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
DSC01030.jpg
29 viewsThe roof has had an extra beam added which runs through the house and cross supports added. (08-Apr-04)dozer
DSC01032.jpg
29 viewsRoof truss - inside view. dozer
DSC05011.JPG
29 viewsThe back bedroom.dozer
DSC03017.jpg
29 viewsThe house as it looks today. (19-May-04)dozer
DSC05046.jpg
29 viewsDecorative work on the entryway. Decorative bricks were placed around the entry posts and cement is used as a border material. (10-Jul-04)dozer
DSC05102.jpg
29 viewsThe surrounding metal has been placed on the perimeter wall and the arrows and leaves are in the process of being painted. The paint used for the decorative elements of the metal are a special yellow primer and gold paint. (31-Jul-04)dozer
DSC00103~0.jpg
29 viewsThe bathroom base should have been laid out 10 centimeters below the base of the rest of the house. (13-Mar-04)dozer
DSC05097.jpg
29 viewsPumps: This is the pump which pumps out of the tank into the house. It is enclosed an a metal cage which is bolted to the ground. (30-Jul-04)

There are two pumps used, one to pump water out of the well, through the filtration system and into the tank, and one to pump water from the tank to the house. Both pumps are Fujika hiiflow GFS-255.

The other pump is in the filtration cage and pumps water from the well to the tank.
dozer
DSC05026.jpg
29 viewsIf you have a problem like this, the water in the storage tank will not be clear, even if it is filtered. Here is a shot of cloudy water in the tank before fixing the well. (06-Jul-04)dozer
DSC05027~0.jpg
29 viewsThe valve is mounted on top of the water tank. The electric is shielded in yellow conduit. (06-Jul-04)dozer
DSC05044~0.jpg
29 viewsFiltration: This filtration system has three units which are made of stainless steel. Each unit runs the raw water through a different filtration agent; carbon, magnesium and an ionizer. (09-Jul-04)dozer
DSC05092.jpg
29 viewsOne other thing to note. A well should not be dug within a meter of the house. This shot shows a well within about 40 centimeters from a house and also you can see the gaping holes around the well due to settling. The settling around the well can further cause a lot of problems for the house structure, for example wall and flooring cracks. (28-Jul-04)dozer
7141 files on 596 page(s) 463

Debug Info 
Debug Output: show / hide