Old Carpet and Padding30 viewsThe old rotted out carpet and padding pulled back in an area with some water damage.dozer
|
|

Grout Line30 viewsThe scissors show that there is no residual concrete in the grout line (prior to grouting) when the tiles are laid in dry pack manner.dozer
|
|
|
|

Land Layout30 viewsOur 1/2 rai. 17-18m by 40-47m. N is up. An early plan. The house was roughly centered N-S later, making front, side and back garden areas. Colorado
|
|

First footing excavation - 5 Oct 201130 viewsAbout 15cm of topsoil supported this organic farm, below is all hard packed sand. Smooth digging.Colorado
|
|
|

Top of Trimmed Piling30 viewsTop of piling showing concrete and steel rebar.