Most viewed
163698_10150120318926579_581311578_7751937_336593_n.jpg
31 viewsdbp
DSCF5040.JPG
A hoist put in position for lifting concrete to first floor for final casting of the first floor slab on top of the precast slabs.31 viewschiyman
DSCF5026.JPG
Pre cast concrete slabs used to form the first floor being delivered31 viewschiyman
DSCF5052.JPG
31 viewschiyman
DSCF5054.JPG
Formwork for window lintel being constructed31 viewschiyman
DSCF5110.JPG
31 viewschiyman
SANY0576.JPG
Garage footing holes31 viewsThe footing holes 1x1x1m for the garage are digged.
I want the garage done asap to get a clean place to rest in the shadow...and to have a dry place for materials!
Size of Garage 6.5x6.5m with 2.25x5m opening...20cm load bearing wall on 15cm slab with 50x20cm foundation (6x 4hun rebar)
Maseratimartin
IMG_5992.JPG
31 viewsnanbuilder
IMG_2815.jpg
More Tiles in Place31 viewsThe outside rows are the guide and red guide lines are used to indicate where each pattern will go. dozer
DSCN0359.jpg
Kitchen Trim Transition31 viewsThe kitchen wall tiles transition to the wood trim. dozer
IMG_2122.jpg
Affixing Side Beam31 viewsThe side metal beams were affixed to the wall with anchor bolts. dozer
IMG_2528.jpg
Rear Window31 viewsThe secured rear opening. dozer