Roofing structure312 viewsThis is the start of the roofing structure. The outside and internal beams are doubled up and welded togetherkknaj
External Front Right View312 viewsOn the sides of the house there are decorative glass blocks (a row two high) above the windows. The windows and doors will be of high grade aluminum. dozer
Frame Spacer312 viewsThe use of a spacer with metal tie to keep the metal frame off the surface. The spacer is used to keep the rebar metal frame in the middle of the anticipated concrete pour. dozer
11 March 2009311 viewsLaying the rebar into the block groove before the glue and the next course of blockpklongball
Cementing of foundations311 views40cm high foundationskknaj
Timer module.309 viewsAn analog timer to fit on the rack inside the MCB housing. This one will carry 16A. An MCB (of the same or a lower amperage should be inserted in the circuit AFTER the clock the MCB will trip out before the overload wrecks the timer. Can be used for anything from perimiter lighting to pool filtration. Needs to be coupled to a relay if high amperage switching above 16A.jazzman
309 viewsGetting ready for the first floor concrete. Steel re-inforcing being laid over the slabs.Thaifu T