|
Most viewed |

33 viewsCinder block wall prior to render. Note that he columns were poured after the blocks were laid to prevent cracking/weakness at the junction. dozer
|
|

Edging the Upper Beam33 viewsAfter the beam has set now it is being cornered. dozer
|
|

Before Unoccupied Condo33 viewsThis condo had not been occupied in several years and was as originally built except that everything in the condo had deteriorated.dozer
|
|

Wall Paper33 viewsThere was ugly wall paper on the wall and blue carpet on the floor, along with a bunch of really old furniture. The carpet had some water damage and the wall paper was peeling off the wall. dozer
|
|

Height of Tile33 viewsThe red chalk line is established by measuring down from the level line.dozer
|
|

Wall Imprefection33 viewsThe painter fixing a wall imperfection. dozer
|
|
|

new guest bath tile grouting33 viewsShastadad
|
|
|
|

eventually will color match kitchen "back splash"33 viewsShastadad
|
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
444 |  |
 |
 |
 |
|

|
|
|