Building Area View 233 viewsLand to be filledSuper8man
IMG_2679.jpg
Outer Rows33 viewsThese are 'bezen' brand small tiles suitable for driveways and patios. The tiler will be using the outside rows as the basis for the pattern. Here straight lines are being generated using a red chalk string line. dozer
IMG_2817.jpg
Setting Tiles into Weber Adhesive33 viewsHere the adhesive material was laid down first and the tiles were set into it. dozer
IMG_2821.jpg
Setting an Edge33 viewsA edge is placed on the step up into one of the storage rooms.dozer
IMG_2686.jpg
Tile Spacer Guide33 viewsA tile is used as a spacer guide to ensure the proper distance between tiles.dozer
IMG_2075.jpg
Working on Top Mesh33 viewsThe top metal mesh work is additionally welded to the roof structure for support. dozer
IMG_2492.jpg
Granite Top Set33 viewsTwo of the granite top pieces are set in place to check the fit. The stove top opening will be cut on-site. dozer
IMG_2508.jpg
Undermount Sink Held in Place33 viewsThe under mount sinks are secured in place after the granite is set and left to dry. dozer
DSC03533.jpg
Installing the Outer Casing33 viewsThe outer casing is just a shell to hide the inner workings of the roll up door. The door rolls up into this casing. This is located on the upper inside. dozer
IMG_2841.jpg
Placing a Casing Panel33 viewsA metal casing panel is being fitted onto the support metal to cover the roll up mechanism on the left side of the door.dozer
IMG_2311.jpg
Completed Column33 viewsA view of a completed column. dozer
DSC02102.jpg
33 viewsAnother lower end example built for a foreign owner. This house here doesn't have a tile roof. (12-May-04)dozer