happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
IMG_2604.jpg
Applying Wall Putty to Ext Ceiling36 viewsUsing putty to cover the junction between the smart boards.dozer
DSC05121.JPG
36 viewsThe back of the house.dozer
DSC05151.JPG
36 viewsView from patio. Note the flower boxes have been completed along with putting paving stones on the pathway.dozer
DSC01058~0.jpg
36 viewsAs stated in the blurb in good building ideas, I like the idea of using double regular block construction. This could also be modified to have one row of red brick in combination with one row of the regular cement block. This would increase building costs little percentage wise, since it would require only a slight increase in labor and inexpensive materials (regular cement block and cement). I would like to try either using this double block construction, or investigate using the heavy cement block as an alternative.dozer
IMG_8484.jpg
36 viewsPreparing for the pour of the upper ring beam. The metal is being affixed in place prior to the form work being affixed. dozer
IMG_3776.jpg
Drive Way Repair36 viewsGrout is applied on either side of the track.
dozer
DSC05125.jpg
Original Front Gate36 viewsA kind of typical entry gate, ugly metal variety. This is after one of the neighbors dozed all the dirt out of the road (ergo the level of the road looks a little funny).dozer
IMG_0877.jpg
True Line36 viewsA true line indicating where the edge of the tile should be. dozer
IMG_0921.jpg
Putty Applied36 viewsWall putty is applied to smooth the area where the new electric outlet is. dozer
IMG_1034.jpg
Original Bathrooom36 viewsThe bathroom after the new water line is attached near the toilet. The floor was partially re tiled. dozer
M02_digging_the_foundation_holes.jpg
Building in Chiang Rai36 viewsThe backhoe brought in to expedite the preparation of foundationsEbenezer
2011-12-16_painting_the_roof_support_beams-.jpg
36 viewsPainting the roof supportsEbenezer
7141 files on 596 page(s) 430

Debug Info 
Debug Output: show / hide