|
Most viewed |
This is how he used it!!39 viewschiyman
|
|
Formwork and steel placed inside for the lintels39 viewschiyman
|
|
|
|
Cement bathtub39 viewsOutdoor courtyard 2m x 6m next to bathroom 2m x 3m.
Total bathroom/courtyard area: 18sqm verticalift
|
|
Glass Tiles39 viewsThe glass tiles under the installed cabinets.dozer
|
|
Outer Support39 viewsThe cabinet structure is made of red brick. The structure will support a U shaped counter. The outside frame will help support the weight of counter.dozer
|
|
Rebar for Concrete39 viewsThe rebar is laid out for the concrete top pour. The poured sub counter will be used to support a granite counter top. dozer
|
|
Tiling on the Inside39 viewsTiling on the inside of the cabinets.dozer
|
|
Top Mesh39 viewsThe top mesh is used to prevent access via the roof, the metal bars are just welded one on top of another (this area will be above the ceiling not will not be seen). dozer
|
|
Trim Wood39 viewsA piece of trim wood for the outside edges of the ceiling. Note that glue is applied prior to applying the piece to the ceiling where it is nailed in place. dozer
|
|
Under Cabinet Stainless Rails39 viewsInstalling under cabinet stainless rails used to hang things (pots, pans, etc). dozer
|
|
7141 files on 596 page(s) |
|
|
|
|
|
412 | |
|
|
|
|
|
|
|