DSC05012.JPG
42 viewsThe kitchen sink.dozer
DSC02269.JPG
Fill Dirt after Posts42 viewsThis build used 4 meter tall prefabricated columns. They were set in footings and allowed to dry for 1 week, then fill dirt was brought in to raise the floor level. dozer
DSC02274.JPG
Fill Brought In42 viewsShows the level of the dirt raised after fill is brought in via a tractor. The tractor was 500 per hour. dozer
IMG_3318.jpg
Wood Doors42 viewsSeveral of the wood doors had swollen and needed to be shaved, some were re-hung and then a oil based paint (Glipton TOA) was used. Since they are not teak they look much better with a solid coat and it also help protects them. dozer
IMG_3326.jpg
Ceiling Replacement42 viewsThe existing ceiling was removed and a new straight line established for the new ceiling. dozer
IMG_3335.jpg
Ceiling Service Entry42 viewsThe installer finishes around the service entry area. dozer
IMG_3756.jpg
Drainage42 viewsWall opened at certain places to allow for drainage.dozer
IMG_3762.jpg
Drainage42 viewsBefore being cemented into place it rained, and we enjoyed seeing that the drainage in use. Min. 3" PVC is used for drainage.1 commentsdozer
IMG_0890.jpg
Grounded Electric42 viewsA new grounded electric receptacle with a telephone jack that will be routed up through the ceiling.dozer
IMG_1038.jpg
Finished Floor Section42 viewsThe finished tile floor with skirting of the original tiles. The painting of the walls, ceiling and trim is also complete. dozer
P1000260.jpg
42 viewsthailazer
IMG_2512.JPG
development waste water pipe; possible cause of erosion along my perimeter wall42 viewsShastadad