42 viewsThe kitchen sink.dozer
|
|
Fill Dirt after Posts42 viewsThis build used 4 meter tall prefabricated columns. They were set in footings and allowed to dry for 1 week, then fill dirt was brought in to raise the floor level. dozer
|
|
Fill Brought In42 viewsShows the level of the dirt raised after fill is brought in via a tractor. The tractor was 500 per hour. dozer
|
|
Wood Doors42 viewsSeveral of the wood doors had swollen and needed to be shaved, some were re-hung and then a oil based paint (Glipton TOA) was used. Since they are not teak they look much better with a solid coat and it also help protects them. dozer
|
|
Ceiling Replacement42 viewsThe existing ceiling was removed and a new straight line established for the new ceiling. dozer
|
|
Ceiling Service Entry42 viewsThe installer finishes around the service entry area. dozer
|
|
Drainage42 viewsWall opened at certain places to allow for drainage.dozer
|
|
Drainage42 viewsBefore being cemented into place it rained, and we enjoyed seeing that the drainage in use. Min. 3" PVC is used for drainage.dozer
|
|
Grounded Electric42 viewsA new grounded electric receptacle with a telephone jack that will be routed up through the ceiling.dozer
|
|
Finished Floor Section42 viewsThe finished tile floor with skirting of the original tiles. The painting of the walls, ceiling and trim is also complete. dozer
|
|
|
development waste water pipe; possible cause of erosion along my perimeter wall42 viewsShastadad
|
|