Balcony door and glass blocks42 viewschiyman
|
|
1st Floor Bathroom - A lot of work to get this finished.42 viewschiyman
|
|
Side View to Rear42 viewsWe will be building behind houseSuper8man
|
|
Inner PVC Water Line42 viewsThe inner PVC water line which is 1" is raised up and lowered into the lined bore hole with the pump on the other side. Note the rope attaches to the pump to aid in lowering it. dozer
|
|
Bezen Tiles Driveway42 viewsThe driveway tiles.dozer
|
|
Poured Concrete42 viewsThe concrete is poured within the formwork. dozer
|
|
Dryed Structure42 viewsThe dried structure after the forms have been removed. dozer
|
|
Glass Blocks42 viewsGlass blocks laid above a ring beam with spacers in place. dozer
|
|
Wood Trim Areas42 viewsAnother view of wood trim areas above the kitchen and study.dozer
|
|
Painting External Ceiling42 viewsPainting the external ceiling with a water based paint, timbershield. dozer
|
|
Upper Switch box + Lower Receptacle box42 viewsThe switch boxes + power points are secured fastened within the wall at the designated points. dozer
|
|
Plastic Wrap for Electric Outlet Cover Plate42 viewsMost don't seem to realize the amount of dust, paint and other construction debris which is airborne during a construction project, most of all the workers. All electric outlet cover plates + switch box plates should be plastic wrapped to prevent ugly hard to clean splatter. dozer
|
|