|
Most viewed |
Pump Used for Circulating Water During Drilling43 viewsThis is the pump used for keeping water circulating during the drilling process. dozer
|
|
Cabinet Walls43 viewsThe supporting walls for the counter are placed according to the design of where the lower doors will go. dozer
|
|
Tiling Complete43 viewsThe tiling and grouting of the cabinets are complete. dozer
|
|
43 viewsKitchen cabinets.dozer
|
|
43 viewsThe roof apex is 1.5 m above the prefabricated columns. Here the foreman is setting the roof apex in place. dozer
|
|
Ceiling Structure43 viewsNew ceiling structure put in place. The original ceiling was done wrong with wire supports as opposed to the aluminum strips and had other problems. dozer
|
|
Prefab Opening43 viewsThis is a prefabricated opening from Chang. Even through it is made of sheetrock it is more durable and holds up better than the home made variety. dozer
|
|
Don't Buy a Toilet43 viewsDon't buy the toilet first until checking the the distance between the center of the waste hole and the wall (yes, we knew that, especially since we heard of others having the problem).dozer
|
|
|
|
|
|
7141 files on 596 page(s) |
|
|
|
|
|
391 | |
|
|
|
|
|
|
|