happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
IMG_1473.jpg
Vent Pipe Wired46 viewsA 3/4" vent pipe wired in place. dozer
IMG_1992.jpg
Nail Prepping46 viewsNails on the frame as well as a 9mm piece of rebar which will be in the vertical beam. dozer
IMG_3656.jpg
Putting up the Curtains46 viewsThe curtain and curtain rails were bought from a curtain shop at jatujak market, price was reasonable and nice r looking that most. dozer
IMG_9051.jpg
Control Unit46 viewsThe control unit for the breakers will be installed here. There are 6 zones attached to individual breakers. The breaker size depends on the load for that zone. Electrics are bticino matix. dozer
IMG_9003.jpg
Electric Line in Wall46 viewsAfter the electric conduit is run up through the wall it is cemented over for a seamless finish render coat.dozer
IMG_0864.jpg
New Electric Receptacle46 viewsA new electric receptacle is established. dozer
IMG_3019.jpg
Original Kitchen Granite46 viewsThe kitchen granite counter will stay, our job was to try to match it as close as possible at the granite factory.dozer
after_3.png
After46 viewsShastadad
IMG_2700.JPG
outside dining room back lights46 viewsShastadad
IMG_2742.JPG
The Pump Prison46 viewsShastadad
IMG_2939.JPG
46 viewsonce again if you are not there they will do it wrong. Now water pipe to house will have to be bent / angled to miss obstructing the moo bans waste water drain inspection coverShastadad
IMG_3017.JPG
pleasantly surprised how good they look46 viewsShastadad
7141 files on 596 page(s) 377

Debug Info 
Debug Output: show / hide