Electric routing to the Pumping Station47 viewsHere the electric is routed around the exterior of the underground water tank. It will service the submerged artesian Franklin pump, the automatic pressure pump and the electronic solenoid (which controls the water level in the tank).dozer
|
|
47 viewsAfter the exterior walls have been rendered. dozer
|
|
|
Walkthrough of Finished Condo47 viewsA quick walk through of the completed condo. It was re-tiled and painted in just 4 days. dozer
|
|
Ceiling47 viewsPlastering up the joints and screw heads in the new ceiling.dozer
|
|
Wall Tiles47 viewsThe wall tiles laid with the appropriate holes for the faucets. Note also the silver color aluminum trim piece that will be used for edging. dozer
|
|
Wall Tile47 viewsWeber 'tile fix' tile adhesive is applied to the back of the wall tile prior to setting it in place.dozer
|
|
Building in Chiang Rai47 viewsPosts erected and gate to the plotEbenezer
|
|
Building in Chiang Rai47 viewsRoof structure and walls nearly completedEbenezer
|
|
|
|
|