happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
IMG_2813.jpg
Installing Shelving Unit48 viewsThe shelving units are installed with anchor bolts to the inside of the concrete structure. dozer
IMG_8994.jpg
Position of Control Box48 viewsThis shows the position where the control box will go at the front right hand corner of the house. The house will have six zones all rigged with the appropriate size breakers.dozer
IMG_3246.jpg
Granite Faucet Hole48 viewsOn site drilling of the faucet hole for the granite counter.dozer
IMG_3251.jpg
Granite Skirting48 viewsInstalling and adjusting the position of the granite skirting on the front of the under mount sink.dozer
IMG_3306.jpg
Wood Frame48 viewsThe wood is teak plywood on top of a frame made of furniture wood.dozer
IMG_3308.jpg
Installing the Wood Structure48 viewsThe wood work is done offsite and then brought in and installed in pieces. The electric which feeds in will support the LED lighting. dozer
P1000265.jpg
48 viewsthailazer
after_4.png
After48 viewsShastadad
IMG_2633.JPG
Between a rock and hard place48 viewsShastadad
IMG_2676.JPG
48 viewsShastadad
IMG_2699.JPG
outside dining room lights48 viewsShastadad
IMG_2810.JPG
tear up and replace carport tiles so rain water will run off48 viewsShastadad
7141 files on 596 page(s) 367

Debug Info 
Debug Output: show / hide