|
Most viewed |
All set for construction of the ground beams48 viewschiyman
|
|
|
Foundation layout with measures48 viewsIt is not a professional plan, but I know what comes where and how...
Actually I put in all info you need to build it. Only a few footings will end in a column...as the house will be build in 20cm ACC blocks load bearing...Maseratimartin
|
|
|
48 viewssite shed on the vacant block oppositeIans
|
|
Building Area View 948 viewsLand to be filledSuper8man
|
|
|
ceiling, master outside deck48 viewsShastadad
|
|
Gas Melting Station48 viewsHere is the rig they used to melt the PVC piping in place. dozer
|
|
Hand Scoring the PVC Pipes48 viewsHere the PVC pipe is grooved. The grooved pieces are not used in the first 8 meters (the top most part is non grooved). They are used at the bottom of the well to allow water to seep in and replenish the supply. dozer
|
|
Drywall Sheeting48 viewsA room after the sheeting is affixed to the frame work, prior to taping, plastering and sanding. This particular room doesn't have a step. dozer
|
|
Mounting the Upper Cabinets48 viewsStarting to Mount the Upper Cabinetsdozer
|
|
7141 files on 596 page(s) |
|
|
|
|
|
366 | |
|
|
|
|
|
|
|