Most viewed |
|
343 viewsAssembling the rebar cages for the columns. Rick B
|
|
Completed Ground Beam343 viewsThis shows the completed ground beam with the noted vertical rebar. Depth indicators are being put in the ground in preparation of the concrete pour of the floor.dozer
|
|
Double block with foam.342 viewstrehanse
|
|
Ground Beam Exterior Wood Form342 viewsForm wood is used on the outside to support the pour of the ground beam.
dozer
|
|
CPAC Quality Control342 viewsCPAC Quality Control staff take a sample of poured cement for a compressive strength test. They will let it dry for 2 weeks and then remove the concrete sample from the form. It is taken to a testing center where the stated KSC (Kilograms per Square Centimeter) compressive strength specification of the concrete is tested. A report will be generated.
dozer
|
|
Block being laid342 viewsLaying another block in place. The blocks are lifted up over the vertically extending rebar and laid into place.
dozer
|
|
|
House Plan341 viewsThe house design is based on Australian home designs from Henley Properties and Simond's Homes. The entrance, study and master bedroom are based on Henley Properties designs, with the rest of the house following design ideas from Simond's Homes.
The area of the house is 250 square metres (including the front porch and rear outdoor area). The quoted price from a builder was 1.7 million baht, however we have decided to manage the project in-family, and are sourcing all the materials ourselves. Max&Bee-in-CM
|
|
Form Work Horizontal Beam #1341 viewsThis shows the form work for the first horizontal beam, which will poured below the window line (beam height 80cm - 90cm). Note also the plumbing vent exhausts run up in the wall vertically and will exhaust through the ceiling.
dozer
|
|
|
|