|
Most viewed |

Water Flow Test50 viewsThe walkway is designed to slope out. Then the external gutter area will route water down to the street. dozer
|
|

50 viewsHere the foreman is doing the roof structure. The apex of the column is 4 meters (as can be seen imprinted on the top of the column) and is underground about 1 meter leaving about 3 meters. The stick is being used temporarily level the upper room beam. dozer
|
|

50 viewsWith this type of roofing the are two parallel c sections done on each ridge. Notice also the roofing is affixed to the metal by using a u bolt which penetrates the roof sheeting. dozer
|
|

Electric in Ceiling50 viewsLaying in the electric in the ceiling area for the new lights, ceiling fan and water heater.dozer
|
|
|

2 bedroom, 3 bath, 2 utility doors50 viewsShastadad
|
|

Floor tiles 19- Feb 201250 viewsEbenezer
|
|
|

repairing stolen main wire50 viewssince wire cannot effectively be "spliced" column containing wire
was opened via a holeShastadad
|
|
|
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
358 |  |
 |
 |
 |
|

|
|
|