Water Flow Test50 viewsThe walkway is designed to slope out. Then the external gutter area will route water down to the street. dozer
DSC02283.JPG
50 viewsHere the foreman is doing the roof structure. The apex of the column is 4 meters (as can be seen imprinted on the top of the column) and is underground about 1 meter leaving about 3 meters. The stick is being used temporarily level the upper room beam. dozer
DSC02450.JPG
50 viewsWith this type of roofing the are two parallel c sections done on each ridge. Notice also the roofing is affixed to the metal by using a u bolt which penetrates the roof sheeting. dozer
IMG_3136.jpg
Electric in Ceiling50 viewsLaying in the electric in the ceiling area for the new lights, ceiling fan and water heater.dozer
IMG_2623.JPG
progress50 viewsShastadad
IMG_2828.JPG
2 bedroom, 3 bath, 2 utility doors50 viewsShastadad
2012-02-16_-_lounge_floor_tiles.JPG
Floor tiles 19- Feb 201250 viewsEbenezer
IMG_2895.JPG
kitchen vent install 50 viewsShastadad
IMG_2942.JPG
repairing stolen main wire50 viewssince wire cannot effectively be "spliced" column containing wire
was opened via a hole
Shastadad
IMG_3027.JPG
tiling the kitchen50 viewsShastadad
2012-03-17_28129_House2C_carport___drive_finished21~0.jpg
50 viewsEbenezer
IMG_3348.JPG
50 viewsShastadad