happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
DSCF4896_resize.jpg
Steel for the Footings placed with Concrete pipes for the below ground sections of the columns supported with yuca poles.51 viewschiyman
DSCF4947.JPG
Backfilling between the ground beams51 viewschiyman
DSCF4946.JPG
Backfilling between the ground beams51 viewschiyman
DSCF4998.JPG
I was very pleased with the quality of the columns - much better than I had anticipated51 viewschiyman
DSCF4962.JPG
Ground floor slab formwork completed and ready for concrete pour the next day. The bathroom (with the blue pipe sticking out) will be formed at a lower level and cast seperately51 viewschiyman
layout.JPG
Layout walls and rooms51 viewsThe main house will only have a smaler kids room beside the master bedroom. The guests will sleep in a pool/ guest house what is separate.
Living room with a lot of glass...nearly round view...
Maseratimartin
ready_for_pile_cap.jpg
51 viewsready for pile capIans
digging_the_holes_for_the_pile_caps.jpg
51 viewsdigging for the pile capsIans
SDC11748_resize.JPG
51 viewsShastadad
SDC11751_resize.JPG
51 viewsShastadad
SDC11764_resize.JPG
51 viewsShastadad
SDC11766_resize.JPG
51 viewsShastadad
7141 files on 596 page(s) 353

Debug Info 
Debug Output: show / hide