Capped Pipes53 viewsClose up of the caps temporarily used on the drain pipes.dozer
|
|

Typical Power Point Installation53 viewsThis shows a power point with a inbound cable co ax TV junction. There is also a telephone jack. Each power point and switch box is temporarily covered with this plastic to prevent splatter during painting and other construction activities. dozer
|
|

Surface Prep for Wall Tiles53 viewsThe surface here is being prepped for wall tiles. dozer
|
|

53 viewsThe metal support structures for the house use metal of guage 4 hun full with the cross supports 3 hun full. They are temporarily held upright by a wood support. dozer
|
|

53 viewsMore work on the roof. The cross members are set in place. The helper in blue is holding the ground while the foreman welds. dozer
|
|

Floor Level53 viewsThe floor is poured level in preparation of the floor tiles.dozer
|
|

Toilet Adjustor53 viewsThe toilet adjust that allows the center of the toilet hole to be less than 30.5 cm (as in this case).dozer
|
|

more land53 viewsthe filled in block. the tractor is parked in front approx of the old pond. krisb
|
|
|
|
|

main line awaiting electric company hook up53 viewsin the same vein. last time main wire was left exposed it was stolen resulting in a 29,000 THB replacement cost, yet they never learnShastadad
|
|