Most viewed
last_preps_before_concrete_pour_garage.JPG
Last preparations for concrete pour of garage slab54 viewsMaseratimartin
P1000451.jpg
54 viewsthailazer
IMG_2350.jpg
Interior: Framework54 viewsThe interior framework is established for the drywall sheeting to be installed. The very beginning of the process is establishing a straight line for every level to be used (if there is a step there would be the step level and the main level). This is done using the water clear tubing method and then setting the level lines in red chalk.dozer
IMG_2352.jpg
Bedroom Installation54 viewsThe first thing done is that the level of the lower step of the ceiling is established around the outside perimeter. The frame is being set up for a lower step which extends outward 60 centimeters and is 15 centimeters deep. dozer
IMG_3611.jpg
Repairing Screen54 viewsFitting the screen into place over some spots that were inadvertently missed by the ceiling installer.dozer
DSCN0492.jpg
Ladder and Access54 viewsThe service entry access is on the ceiling with the wall mounted ladder providing access. The glass blocks are the oversized 30 cm x 30 cm variety. dozer
IMG_9036.jpg
Archway Completed Section on the Right54 viewsThe finished archway prior to rendering: notice the lower portion is poured within formwork and the upper portion is brick and mortar. The heavy lower portion is supported by a rebar strand framework which was welded on to the box section at the top. dozer
IMG_9029.jpg
Hole for Submerged Water Tank54 viewsThis shows the start of the 1800 liter underground water tank. dozer
IMG_9369.jpg
PVC Pipe Joined to Tested Section54 viewsThe pipe is being run from the automatic water pump to the previously tested in house section (note the cap on the pipe). Any exposed pipe section will be protected within a concrete pour. dozer
IMG_9245.jpg
Routing Electric Wire to the Perimeter Wall54 viewsElectrics are routed to the perimeter wall for above wall lighting and the exterior mounted door bell. This particular run of electric will be contained in the drive way pour.dozer
IMG_9262.jpg
Electric Conduit Run in Drive Way Columns54 viewsThe yellow conduit is laid in place in the left drive way column. The wire strands are in place to support the wall lighting and the door bell.dozer
IMG_9290.jpg
Driveway Pour in Process54 viewsHand mix was used on the driveway. Red bricks are used as a starting spacer to ensure that the rebar mesh doesn't sit on the ground, further adjustment is done by the 'pull into place method' as the pour progresses. The meshing is pulled to be centered within the 10 centimeter pour.dozer