|
Most viewed |

Master Bedroom & Lounge Areas54 viewsHallway door is on leftchangnoi
|
|

The metal lady54 viewsThe local very friendly and helpful metal shop lady. Total cost to cut 3 metal plates (30 cm X 30 cm), and the long bolts and 20 nuts was 1360 baht.Max&Bee-in-CM
|
|
|

Tile Planning Yes that is an actual Plan that is being used OMG54 viewschangnoi
|
|
|
|
|

Backfilling and application of water to assist with consolidation54 viewschiyman
|
|

Completed Ground slab brushed finish ready to accept floor tiling later on54 viewschiyman
|
|

Note the reinfocement for the ground floor slab (mesh) was tied onto the ground beam reinforcement for extra strength.54 viewschiyman
|
|
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
339 |  |
 |
 |
 |
|

|
|
|