Inbound Electric Line tie in55 viewsThis shows where the inbound electric main line will enter the house, at the roof line above the patio.dozer
|
|
Electric Routed to Wall Lighting55 viewsElectric is routed in the upper perimeter wall ring beam. dozer
|
|
Smoothing the Render55 viewsAfter setting in a bit more the surface is worked smooth with the use of a render's darby in combination with a wet sponge. dozer
|
|
Glass Block Offset55 viewsThe glass blocks are laid in to be even with the outside wall after rendering. This shows the bathroom wall, the clear blocks (opaque) are in the shower stall, the blue blocks are above the sink.dozer
|
|
Level Line55 viewsA long clear plastic tubing is used to create a level line which will be used to set the top level for the floor tiles. The tube is filled with water, on one end a line is marked at the water line. At a different area perhaps several meters away another mark is made (in is a two man process). This two independent marks will be at the same level and measurement can be made from this point downwards to determine the target level for the tiles. dozer
|
|
Close Up of Finished Wood Work55 viewsThere is a left shelf and framed mirror along with the top ornamental lamp station. The lighting on top is LED lights.dozer
|
|
permanent water meter re-cemented 55 viewsShastadad
|
|
|
|
|
|
|