guest bedroom and deck complete56 viewsShastadad
|
|
|
|
|
56 viewsKanyong initially gave me grief about return and replace (two week rule) but backed down when they realized that their special order material delayed the start of workShastadad
|
|
|
Setting Toilet Drain56 viewsSetting the toilet at the correct distance per the plan. dozer
|
|
Ceiling Secured Room56 viewsThis was the framing of the secured room where the ceiling is actually under a security level of metal welded together. The framework is tied to the security frame in this case, normally it is affixed to the roofing metal. dozer
|
|
Door Painting56 viewsOil based paint (TOA Glipton) applied to louvered solid hardwood bathroom door. dozer
|
|
Additonal Waterproofing Agent Applied to the Bottom56 viewsLanko K11 waterproofing agent is skim coated on the bottom (as shown) and will be applied to the sides of the enclosure as well. dozer
|
|
Finished Submerged Water Tank56 viewsThe finished tank, note the inbound water pipe (top), the outbound water pipe (center) and the electric inbound yellow conduit which feeds the solenoid valve within the tank. dozer
|
|