360 viewsFront fence after renderingRick B
|
|
359 viewsLower foundation beam of front fenceRick B
|
|
359 viewsWooden staircase railing in progressRick B
|
|
Ground Beam Frame sits on a Footing358 viewsSince we are using load bearing (heavy) walls, appx. 5.5 pieces of the 12 mm rebar on average cover each section of the ground beam. This shows a T section of the ground beam metal frame sitting on concrete footing.
dozer
|
|
Vertical Rebar for Load Bearing Walls358 viewsNotice the vertical rebar is secured in place appx. each 40 centimeters to coincide with the holes in the large cinderblocks that will be used for the load bearing walls.
dozer
|
|
This is the type of house we are going to build357 viewstrehanse
|
|
357 viewsMaster bathroom sink counter just pouredRick B
|
|
Pool Chlorinator Control Unit356 views[pic before installation] Wall mounted control unit for saltwater chlorinator. Includes timer for filtration cycles. Sensor in catalisor unit measures Chlorine level and switches the pumping cycle on and off as required, producing chlorine to the required level. jazzman
|
|
Beam Formwork after Fill356 viewsThis shows the foundation ready to have the ground beam poured. Cinderblocks have been used in the form work inside the house, form wood is used with supports on the exterior. dozer
|
|
|
Concrete Vibration355 viewsConcrete vibrated as it is poured into the ground beam. Vibrators are necessary to ensure that the concrete doesn't have voids and settles evenly though out the form.