Tank Service57 viewsThe inside of the tank being cleaned of any debris.dozer
|
|
Lanko K11 Waterproofing57 viewsThe cement skim coat which is evenly applied to the inside of the water tank as a double check against leakage. Note that the Sika water proofing which is mixed into the cement should be sufficient. dozer
|
|
Installing the Main Electric Panel57 viewsThe main electric panel contains associated breakers running from 10 w up to 32 w depending on the load of devices on the particular station. There are 6 stations in the house. All electric equipment is Bticino Matix.dozer
|
|
Inside view of Junction Box57 viewsOnly secure wire fasteners are used in a totally electric tape free installation. This means less to wear out and go wrong over time.dozer
|
|
Applying the Color Render Coat57 viewsThe color render coat is applied much the same as a normal render coat. In preparation however a previous coat was applied in a rough state and allowed to set for a week, which prevents the underlying block shape from bleeding through. dozer
|
|
Stone Trim being Applied57 viewsThe stone trim being cemented into place. The stone tiles are offset for effect. dozer
|
|
57 viewsAt this stage the roofing has been done (notice if it was heavy roofing the walls would be completed first). dozer
|
|
Granite Counter and Wood Doors57 viewsThe under mount sink and the granite counter top works nice in this condo. The wood doors on the bottom allow for easy access to the storage space below. Notice the tile trim piece is aluminum (as opposed to plastic trim).dozer
|
|
Building in Chiang Rai57 viewsDoor frames in Amosa from Lao installed. Rear door leading to outside kitchen.Ebenezer
|
|
ground stake in electric room, wish I had been there for install 57 viewsShastadad
|
|
|
waterfall man continues his magic57 viewsShastadad
|
|