happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
IMG_8814.jpg
Pressurized Water Pipe Test58 viewsA water test must be preformed early on in the building process. This test ensures that there are no leaks within the system. The automatic pump is set up and a run-in test is preformed for 24 hours. If there are any leaks in the system the pump will cycle on during the test. dozer
IMG_9269.jpg
Openings in the Wall58 viewsThese opening in the perimeter wall let some light in and give the garden area a nicer feel that if the wall was solid.dozer
IMG_9449.jpg
Putty58 viewsThe fill putty is colored using the urethane as applied to the original wood trim to achieve a matching color. dozer
IMG_9441.jpg
Wall Tiles Applied58 viewsThe lower row of tiles is supported by concrete nails. This level is where the floor tiles will be after they are laid. Spacers are used to ensure consistent spacing. The surface is roughed prior to laying the tiles.dozer
DSC02446.JPG
58 viewsAnother shot showing the pour of the ground beam. The prefabricated columns have holes which allow the rebar to be affixed to the ground beam. You can see the rebar producing from the column at the 12 o'clock position. The columns are arowan block brand (premium). dozer
P8280617.JPG
land land land58 viewskrisb
2012-02-19_-_the_current_state_of_the_outside.JPG
58 viewsEbenezer
IMG_2955.JPG
wire protector58 viewssometimes you just have to do it yourself or it won't get doneShastadad
IMG_3013.JPG
dual down spouts for " balance "58 viewsShastadad
IMG_3632.JPG
looking down58 viewsShastadad
12_10_2010_2.jpg
My In-Laws House (12 10 2010)58 viewsThis is where we stayed during the building of the house. Enough said about that.fgrossiii
051Carport_28Custom29.JPG
58 viewspklongball
7141 files on 596 page(s) 324

Debug Info 
Debug Output: show / hide