|
Most viewed |
Bathroom #160 viewsThe bathroom off the study area. The enclosure is 10mm glass / stainless custom made for around 15k from the same guy that did the aluminum windows.dozer
|
|
Bathroom #260 viewsThere is a small granite sink unit in each bathroom. The sink is an under mount type.dozer
|
|
Pipes after Floor Pour60 viewsA view of the bathroom floor pvc drain pipes + inbound water pipes after the bathroom floor has been poured. There are 2 floor drain pipes, a solid waste drain pipe, a sink drain pipe, and three inbound water pipes. dozer
|
|
Junction Box60 viewsThe view of an electrical junction box in the attic. Note that the electrics are securely fastened with plastic affixers which ensures full protection of the electric wires.dozer
|
|
Wall Columns60 viewsAs always, the columns for the perimeter wall are poured after the blocks are laid. This ties the blocks into the column and is much more durable.dozer
|
|
Rendering Rod60 viewsThe rendering rod is used to level off the applied aerated block rendering compound after it has had time to set. dozer
|
|
Patio Pour60 viewsShows the pour of the patio area. The columns are protected during the pour as cement and other discolorants are hard to clean off the stone facing. dozer
|
|
Stone Trim60 viewsA close up of the red stone trim applied to the exterior patio columns. This is affixed with a adhesive cement product.dozer
|
|
Ceiling in Kitchen60 viewsThe ceiling in the kitchen after the installation of the trim wood.dozer
|
|
Grouting the Patio60 viewsA premium grout (mold resistant) was used throughout the house.dozer
|
|
60 viewsThe wire being snipped in place. dozer
|
|
French door refrigerator / freezer60 viewsShastadad
|
|
7141 files on 596 page(s) |
|
|
|
|
|
314 | |
|
|
|
|
|
|
|