happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Most viewed
DSCN0484.jpg
Bathroom #160 viewsThe bathroom off the study area. The enclosure is 10mm glass / stainless custom made for around 15k from the same guy that did the aluminum windows.dozer
DSCN0489.jpg
Bathroom #260 viewsThere is a small granite sink unit in each bathroom. The sink is an under mount type.dozer
IMG_8769.jpg
Pipes after Floor Pour60 viewsA view of the bathroom floor pvc drain pipes + inbound water pipes after the bathroom floor has been poured. There are 2 floor drain pipes, a solid waste drain pipe, a sink drain pipe, and three inbound water pipes. dozer
IMG_9097.jpg
Junction Box60 viewsThe view of an electrical junction box in the attic. Note that the electrics are securely fastened with plastic affixers which ensures full protection of the electric wires.dozer
IMG_9218.jpg
Wall Columns60 viewsAs always, the columns for the perimeter wall are poured after the blocks are laid. This ties the blocks into the column and is much more durable.dozer
IMG_9068.jpg
Rendering Rod60 viewsThe rendering rod is used to level off the applied aerated block rendering compound after it has had time to set. dozer
IMG_9293.jpg
Patio Pour60 viewsShows the pour of the patio area. The columns are protected during the pour as cement and other discolorants are hard to clean off the stone facing. dozer
IMG_9279.jpg
Stone Trim60 viewsA close up of the red stone trim applied to the exterior patio columns. This is affixed with a adhesive cement product.dozer
IMG_9586.jpg
Ceiling in Kitchen60 viewsThe ceiling in the kitchen after the installation of the trim wood.dozer
IMG_9729.jpg
Grouting the Patio60 viewsA premium grout (mold resistant) was used throughout the house.dozer
DSC00094.jpg
60 viewsThe wire being snipped in place. dozer
IMG_2894.JPG
French door refrigerator / freezer60 viewsShastadad
7141 files on 596 page(s) 314

Debug Info 
Debug Output: show / hide